By Greg Allan, tradesman and creator of Data First Coaching
Why does hiring the first tradesperson feel so risky for a concreter?
Most concreters put off the first hire because a tradesperson's wage is a bigger number than an apprentice's, and the fear of paying it before the work is locked in feels like the safer thing to avoid. That fear is real, but it is looking at the wrong number. It looks at cost, not at what the hire can actually run on site without the owner standing over them.
A concreting business owner is usually director, quoter, scheduler and ops manager, as well as the best hand on the tools. Every one of those hats gets worn at once, often on the same pour day. The first hire is what starts to split the business owner from the tradesperson, and that split only happens if the hire can genuinely take weight off the owner rather than add to it.
What happens on pour day if the new hire can't run the finish alone?
If the first hire is an apprentice, the owner is still the one running the pour. Ready-mix is booked to the hour, the pump truck is on site charging whether it is used or not, and the builder is watching the finish, so there is no spare time to teach screeding, floating or control joint placement while all of that is happening.
An apprentice cannot be left to manage curing on an exposed aggregate driveway or close out a polished concrete floor to the standard a builder will sign off on progress. The owner ends up doing both jobs, the pour and the training, which is exactly the trap that keeps a concreter tied to every job instead of growing the business.
Why is a qualified tradesperson the first hire that actually grows a concreting business?
A qualified tradesperson is a cash generating hire from the first day on the crew. They can be out on a slab, a footpath or a kerb and channel job charging for labour and materials, where an apprentice cannot yet run that work unsupervised. That difference is the whole point of the first hire.
Training an under skilled person works once a concreter already has spare capacity and a team around them to absorb it. Before that point, every hour spent training is an hour not spent quoting, dealing with the ready-mix supplier or chasing the next driveway or decorative job. The first hire has to pay for itself from the pour, not slow the owner down while it learns to.
What does a qualified hire free you up to do instead of staying on the tools?
Once a qualified hand can run formwork, reo and base preparation to your standard without you checking every step, you get hours back to quote more work, build relationships with builders and chase the exposed aggregate and polished concrete jobs that carry better margin than a standard driveway pour.
That is also where AI agents start to matter. An AI agent is software that does a job the way you would, with your prices, wording and rules, so the quoting follow ups, the scheduling around weather and pump truck availability, and the chasing of progress payments from builders can run without you doing it by hand every evening. Data first, the numbers in your own job and finance records show which jobs your crew can run solo and which still need you on site, so you know exactly how much of your week the hire has actually freed, rather than guessing from how busy it feels.
Where does an apprentice fit once you have a qualified hand on the crew?
An apprentice fits well as a second pair of hands once there is a qualified tradesperson already carrying a pour, because now someone else has the spare capacity to show them the trade without pulling the owner off billable work.
Picture a concreter who had been running two qualified tradespeople on the tools, a costly way to staff the work when every pour needed two full wages on site. He restructured the crew so one qualified tradesperson now works alongside a second year apprentice instead of a second qualified hand. The qualified hand still runs the finish and signs off the slab, the apprentice learns on real pours, and the crew costs less to field while the standard the builder expects stays the same.
That order only works because the qualified hand came first. Put the apprentice in before there is someone experienced to carry them, and the whole crew's output drops back to what the owner alone can manage.
How does Data First Coaching approach this?
Data First Coaching starts from your own crew costs, your job margins and how your pours are actually staffed, read through the Trade Business Intelligence, rather than from a general rule about apprentices or tradespeople. It looks at where the real ceiling sits, whether that is the owner still running every pour, a crew costing more than the work justifies, or office hours eating into quoting time, and works out where the first or next hire actually needs to go.
Greg Allan, who built and ran his own concreting and trade business before coaching others, is open that his own first hire was the wrong order. As he puts it, “I hired an apprentice first. And then I couldn't grow”. The how, the numbers to check and the way to work out your own crew structure, is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member and built for owners who are open minded, innovative and willing to share what they learn.
Looking for a business coach who starts from your numbers? Concreter Business Coach or every answer for concreters.

