By Greg Allan, tradesman and creator of Data First Coaching
Why can't I get off the tools as a concreter?
Most concreters find the business runs flat out around pour day and dead quiet the week after, and the pattern repeats because the owner is the one holding the trowel. While the owner is checking formwork, setting reo and finishing the slab, nobody is quoting the next driveway or chasing the builder for a progress payment. The pipeline dries up because the person who should be filling it is on site.
A concreting business runs in lumps around weather windows and pump truck availability, so there is no gentle slope of work to lean on. If pour day always needs the owner's hands, the gap between jobs gets wider every time the crew finishes a slab, because quoting and follow up only happen in whatever hours are left over, and there usually are none.
What happens if a concreter keeps climbing back onto the tools?
The pattern most concreters fall into is a climb and slide. The owner gets a run without pours, catches up on quotes and chases a few builders for progress payments, work comes in, and the owner is straight back on the tools for the next pour, undoing the catch up. Nothing changes until the handover itself changes.
This cycle is why growth can stall even when the crew looks flat out on site. A concreter can be fully booked for driveways, slabs and exposed aggregate work and still be going backwards, because the owner never gets the clear run needed to build the next three months of work. The business swings between flat out and dead quiet instead of settling into steady load.
How many hours on the tools is too many for a concreter?
The number that tells the truth here is the hours the owner actually spends on pour day, formwork, finishing and curing each week, not the feeling of being busy. Greg's teaching puts a redline at around twenty hours a week on the tools, because past that point there is not enough left in the week for quoting, follow up and keeping builders warm for the next job.
Memory is a poor judge of this. An owner who feels like they are only popping onto site for the big pours often finds, once the hours are actually tracked, that pour day, base preparation and finishing are eating far more of the week than expected, which is exactly why the diary keeps running dry even though the owner feels like they are managing it fine.
What has to change in the crew before a concreter can step back?
Spare capacity has to exist in the crew before the owner steps back, not after. If every crew member is already fully loaded on pour days, any new job just pulls the owner straight back onto the tools, because there is nobody else who can run a pour, manage a pump truck booking or supervise finishing and curing without the owner standing there.
This is why stepping back works for some concreters and fails for others on the very next decorative or polished concrete job. The fix is building that capacity in first: someone on the crew trusted to run formwork and reo checks, handle a control joint layout and see a pour through to finishing without the owner on site, so the owner's time is actually free rather than just unsupervised.
What is the hire that actually gets a concreter off the tools?
The hire that breaks this ceiling is rarely another concreter. Adding a second or third tradesperson adds pour capacity, but it does not free the owner from scheduling, pump truck bookings, builder progress claims and client calls. The hire that does that is an operations role, someone who takes on the phone, the diary and the day to day running of jobs.
Once a concreter is full time on scheduling crews, booking pump trucks, chasing progress payments from builders and fielding new enquiries, on top of still being needed on pour day, that is the ceiling an ops hire is built to break. It is a different role from the crew, and treating it as just another tradesperson hire is why some owners add staff and still cannot get off the tools.
Can software or apps help a concreter get off the tools?
Some of the non-billable work that keeps a concreter tied to the office, such as following up a builder for a progress payment, chasing an unanswered quote or reminding a client about a pour day, can be taken on by AI agents. An agent is software that does a piece of office work the way the owner would do it, using the owner's own prices, wording and rules, so it is not a generic bot answering for every trade the same way.
A data first approach looks at the owner's own job and finance numbers to see exactly where the office work is piling up, rather than guessing. For some concreters an off the shelf app for scheduling or invoicing already does the job well enough to keep. For others, the better move is owning systems built around how their own jobs run and how their own builders and homeowners buy, with AI agents handling the follow up that currently only happens when the owner finds a spare hour. Either way, the point is freeing the owner's time to quote the next slab, not to work fewer hours for their own sake.
How does Data First Coaching approach this?
Data First Coaching starts by looking at the owner's own hours on the tools against their own quoting and follow up activity through the Trade Business Intelligence, because that is where a concreter's real ceiling usually shows up first, not in a feeling of being busy. From there the coaching works out where capacity actually needs to be built in the crew before any step back happens, rather than guessing at a hire and hoping.
Greg Allan puts the common pattern simply: “You literally climb up and then you slide back down.” The how, the specific hire, the handover and the systems that stop the slide, is worked through inside the Academy, with members, because the Academy is for owners who are open minded, innovative and willing to share what they learn, and the Trade Business Intelligence is powered by every member.
Looking for a business coach who starts from your numbers? Concreter Business Coach or every answer for concreters.

