By Greg Allan, tradesman and creator of Data First Coaching
Why do so many solar installers lose track of what they are actually meant to comply with?
A solar install sits under several rules at once: the general wiring rules, the PV-specific installation rules, the inverter and grid connection rules, a state electrical licence, a national installer accreditation, and work health and safety rules for working on a roof. Most solar installers carry all of this in their head rather than in a system that checks it against each job.
That works until the job type changes. A battery add-on, a commercial solar roof, or an older switchboard can each pull in a different standard or approval step than the install the crew did last week. When compliance is remembered rather than checked, it is usually found out after the quote has gone out, not before.
Why does the compliance side of a job quietly eat into the margin?
Certificate paperwork, network approval waiting time and standard-required testing are a cost of the job, the same as labour and panels, but they often do not get costed that way. A quote built on a feel for materials and install hours, with the paperwork and approval steps added afterwards as a round number, has not actually been checked.
For a solar installer running several crews across several install types, that gap repeats on every job quoted the same way. It is easy to miss from memory and obvious once it sits in the numbers against gross profit.
Which standards and licences actually apply to a solar installer's work?
Electrical work on a solar install has to meet the general wiring rules in AS/NZS 3000 and the PV-specific installation and safety rules in AS/NZS 5033, with testing carried out and verified against both, as set out in Energy Safe Victoria’s guidance on compliant PV installations. The same guidance notes that handing the system owner a commissioning sheet and installation checklist under AS/NZS 5033 is a mandatory part of the standard, not optional paperwork.
Inverters and battery grid connection sit under AS/NZS 4777.2:2020, the current requirement pointed to by both Solar Victoria’s guide to configuring inverter settings and Energy Safe Victoria’s grid connected inverter guidance.
On top of the standards sits licensing and accreditation. Solar Victoria’s rebate requirements set out that a solar PV installer must hold an unrestricted electrical licence, or an equivalent interstate licence recognised by the relevant state regulator, and must hold active installer accreditation for grid connected photovoltaic systems, currently a requirement tied to the Federal Government’s rebate and certificate scheme. Tasmania’s regulatory guide on solar panel installations and ACT guidance on grid connected PV arrays set out equivalent standards and licence requirements for their own states.
Roof access brings its own code. SafeWork NSW’s Work on Roofs code of practice covers anyone who installs or maintains roof mounted plant, panels included, and SafeWork NSW’s guide to safe solar panel installation sets out when a licensed asbestos removalist has to be brought in separately, rather than the solar crew handling it themselves.
Which of these applies, and which regulator enforces it, differs state to state in Australia, with Victoria, Tasmania, the ACT and New South Wales each running their own version through the pages above. A solar installer working in New Zealand sits under a different regulator again, so the one to check is whichever applies where the job actually is.
This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.
How do you keep the cost of all this compliance inside the gross profit on every quote?
You treat certificate work, network approval delay and standard-mandated testing as a line on the quote, not a cost absorbed after the job is done. Greg’s quoting principle is that gross profit margin gets checked at the point of quoting, with a quick calculation, before the quote goes out, rather than assumed and found out later.
Accredited work makes this sharper for a solar installer than for most trades, because installer accreditation and an unrestricted electrical licence cannot be spread across whichever crew member is free that day. That time is a genuinely scarce resource, not a standard install hour, and it has to be priced as one.
Picture a solar installer whose leads, quotes, job profit and incoming emails sit in different places, and who works out cable sizing and voltage drop by hand after every site visit before a quote can even be written. That same solar installer could instead run a business management system built on their own jobs, one that tracks every lead through to a booked job, works out cable sizing and voltage drop as part of quoting, reports the profit on each job automatically, turns incoming emails into tasks, and fills in a quote from photos taken on the site visit. That is what data first looks like in a solar business: the margin and the compliance cost sit in the same place the quote is built, not worked out separately afterwards.
AI agents are part of how that gets carried day to day. An AI agent is software that does a job the way you would do it yourself, with your own prices, your own wording and your own rules. AI agents built around a solar installer’s own job and finance data can turn a site visit into a priced quote or an inverter commissioning sheet into a filed record, so certificate and network approval paperwork gets held to the same standard the install itself has to meet, instead of being chased up after the invoice has gone out.
Where can you check the current rules?
- Energy Safe Victoria’s guidance on compliant PV installations: wiring and PV array standards, testing, verification and commissioning sheet requirements.
- Solar Victoria’s rebate requirements: electrical licence and installer accreditation requirements tied to rebate and certificate work.
- Tasmania’s regulatory guide on solar panel installations: standards and licensing for electrical work on a solar install in Tasmania.
- ACT guidance on grid connected PV arrays: standards for new grid connected installations in the ACT.
- SafeWork NSW’s guide to safe solar panel installation: licensing of the installer, and when a separate asbestos removal licence applies.
- SafeWork NSW’s Work on Roofs code of practice: obligations for anyone installing or maintaining roof mounted plant, panels included.
- Solar Victoria’s guide to configuring inverter settings: the current inverter standard for grid connection of solar and battery systems.
- Energy Safe Victoria’s grid connected inverter guidance: the regulation requiring compliant inverters from the standard’s current version.
How does Data First Coaching approach this?
Data First Coaching does not start with another standards checklist. It starts by looking at a solar installer’s own job and finance data through the Trade Business Intelligence, to see where compliance work is actually sitting against gross profit on real jobs, not in theory. Greg has run that conversation himself: as he puts it, “I'm the only accredited solar installer in my business”, which is exactly the kind of scarce, specific cost that memory tends to miss and the numbers do not.
From there the work is finding where a thin margin actually starts, whether that is certificate time, network approval delay or testing, and putting the right check in before the quote goes out rather than after. The how of building that is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member who is open minded, innovative and willing to share what they find.
Looking for a business coach who starts from your numbers? Solar Business Coach or every answer for solar installers.

