By Greg Allan, tradesman and creator of Data First Coaching
Which Australian Standards and codes does a painting business work to?
A painting business works to a mix of state trade licensing rules, work health and safety codes, and the technical standard that describes how paint systems should be applied. Which rules apply depends on the state, whether the job is residential, strata or commercial, and whether it involves spray work or lead paint. There is no single national rulebook a painter can tick off once and forget, because licensing sits with each state regulator while the technical standard and the safety codes sit with separate bodies again.
The reason this matters is not the list itself. It is what happens to the quote once one of these obligations turns up mid-job, which is covered further down.
Does a painter need a licence to quote and invoice a job?
Whether a painter needs a trade licence depends on the state and the size and type of the job, not on painting as a trade in general. In New South Wales, NSW Fair Trading says a contractor licence is needed for residential building or trade work, including painting, once the labour and materials value passes a threshold set out on its own page, and that stand-alone internal paintwork contracts can sit outside that requirement unless the paintwork is part of broader home building work defined in the Home Building Regulation.
In Queensland, the QBCC licenses painting and decorating as its own trade category, covering surface preparation, texture coatings, wallpaper and colour matching, and sets out the managerial qualification a licence holder needs to run the business side of the trade. Queensland also allows licence holders from other states or from New Zealand to apply for mutual recognition, which matters for a painter who picks up new build or commercial work across a border.
In Western Australia, registered painters and decorators carry personal responsibility for every job they put their name to, and that responsibility cannot be handed to a subbie or a client even where the client agrees to it. A painter running crews across several sites still carries that responsibility on each one.
Because licensing is set state by state, the honest answer for any painter reading this is to check the current rules with the regulator in the state the job is in, every time the business quotes a colour consultation, a repaint or a new build job it has not done in that state before.
What does AS/NZS 2311:2017 actually require on site?
AS/NZS 2311:2017 Guide to the painting of buildings is described by WA's trade training guide as the recognised industry standard for the painting industry, and it sets out recommended good practice for the design, application and maintenance of paint systems used to write up painting specifications. WA's guide for registered painters says painting and decorating work in WA should follow AS/NZS 2311:2017 or the paint manufacturer's own specification, and a WA industry bulletin on paint adhesion ties the standard directly to the requirement that painters apply paint systems in a proper and proficient manner. Main Roads Western Australia references the same standard in its own anti-graffiti specification for repainting over graffiti.
For a painter, this standard touches almost everything that gets quoted: how many coats an interior or exterior surface needs, how primer is chosen and applied, how long prep has to run before a top coat goes on, and what counts as a defect that has to be rectified rather than left as a touch-up.
Spray painting carries its own code again. Safe Work Australia's Code of Practice on spray painting and powder coating sets out how to manage the risks that come from using, handling and storing hazardous chemicals, and from the electrical, noise, manual handling and plant hazards that come with spray work. It also names specific chemicals that must not be used, handled or stored for spray painting at all. Lead paint carries a code of its own too: in Victoria, WorkSafe's lead compliance code gives practical guidance for anyone with duties under the state's own Occupational Health and Safety Act and Regulations, and the same page notes that Victoria has not adopted the model work health and safety laws other states use, so its own OHS rules apply instead.
This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.
What happens to your margin when compliance work turns up mid-job?
Every one of those obligations can turn into extra scope on a job you have already quoted, and that is where you can lose margin without noticing. A lead paint test on an older repaint, an extra day of scaffold because the standard calls for a different access method, or strata-mandated rectification of a defect found on a commercial job, all cost real time and money, and none of it is free just because it is compliance.
The trap is treating that extra work as something to absorb rather than something to quote. A job can read as healthy on the labour line and still bleed margin once you blend a compliance cost into the same quote without pricing and checking it on its own. An exterior repaint already running behind because of weather can make that temptation worse, since the instinct is to get the job finished rather than stop and reprice the scaffold or the testing. The same goes for marking a cost up by a standard amount rather than checking what that markup actually returns as margin on the sell price, because a markup and a margin are not the same number, and if you treat them as the same you can be giving away more of the job than the paperwork shows.
How can AI agents keep compliance costs from eating your margin?
You can set a rule that every extra scope item, whether it is lead paint testing, added scaffold days or strata rectification, gets run through the same margin check as the original quote before it goes out as a variation. An AI agent is software that does a job the way you would do it yourself, with your prices, your wording and your rules, and one of the jobs it can carry is holding that gate open on every variation so nothing goes out the door until the margin has actually been checked.
That matters because the moment of risk is the variation, not the invoice at the end of the job. By the time a painter notices the margin has slipped, the paint is on the wall and the crew has moved to the next site. An AI agent built around your own job and pricing data can flag the variation before it is sent, the same way it can hold your scaffold hire account, your paint supplier pricing and your lead testing cost as data instead of memory. Working data first from your own numbers, rather than from a feeling that the job should be fine, is what catches this before the job closes out rather than after.
Where can you check the current rules?
- NSW Fair Trading - Painting work: licensing thresholds and the definition of painting work for contractor licensing in New South Wales.
- QBCC - Painting and decorating: licence scope, qualifications and mutual recognition for painting and decorating in Queensland.
- WA trade training guide to Painting & Decorating: the standing of AS/NZS 2311:2017 as the industry standard.
- WA - Information and obligations for registered painters and decorators: registration responsibilities and the standard WA painters should work to.
- Safe Work Australia - Spray painting and powder coating Code of Practice: managing hazardous chemicals and plant risks in spray work.
- WorkSafe Victoria - Lead compliance code: duties under Victoria's own OHS Act and Regulations for lead exposure.
- Main Roads WA - Specification 908 Anti-Graffiti: an example of AS/NZS 2311 applied in a government specification.
- WA Industry Bulletin - Paint adhesion to white set plaster: how the standard is used to judge whether paint has been applied properly.
How does Data First Coaching approach this?
Data first coaching with Greg Allan does not start by asking which Australian Standard or code applies to a painter's work. It starts with the owner's own job and quoting data through the Trade Business Intelligence, looking at where compliance scope, lead testing, scaffold hire, strata rectification, actually shows up against the margin on real jobs already run. That is usually where the problem starts, not in the standard itself but in how the extra scope around it gets quoted and checked. The how, including the way that margin gate gets built into a painter's own quoting and variation process, is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member who joins it open minded, innovative and willing to share what they learn.
Looking for a business coach who starts from your numbers? Painter Business Coach or every answer for painters.

