By Greg Allan, tradesman and creator of Data First Coaching
Why does a square metre rate still leave a tiler short at the end of the job?
Because a square metre rate blends everything into one guess, and guesses are never even across a job. A tiler quoting a bathroom or kitchen on rate alone is folding labour, tile supply, adhesive, membrane and the waterproofing into a single number that looks tidy on the quote but hides which part of the job actually ate the margin.
Breakage on large format tile, extra screed to fix falls in a shower recess, a wet area that needs more membrane coats than planned, time lost waiting on other trades before grout can go in. None of that shows up as its own line. It just quietly comes off the bottom of the job, and most tilers only notice when the bank balance doesn't match the win they thought they'd had.
Why does subbing to a builder on a day rate hide the same problem?
Because a day rate set once, usually based on how fast the owner personally works, rarely gets checked against what an average day on that job actually costs. A tiler subbing to a builder or running renovation work often prices the day rate from memory, not from this week's cost of adhesive, membrane and tile.
Waiting on other trades to finish before floor preparation can start is normal on a renovation site, but if the day rate doesn't account for that waiting time, every delay is absorbed for free. Builders rebook the tiler who turns up and gets it done, so the rate rarely gets questioned, it just gets squeezed tighter every renewal.
What number actually tells you if a bathroom or kitchen job made money?
Gross profit margin, not markup, and it needs checking at the moment you quote, not weeks later when the invoice goes out. Markup tells you what you added to cost. Margin tells you what's actually left once everything the job really consumed, including the waterproofing warranty, breakage and the day you lost waiting on the plumber, is accounted for.
When you check margin at the point of quoting, you can build a good, better, best option into every job, standard tile and grout, a large format upgrade, or a full wet area package with extended warranty, and close it with a start date booked in rather than a price left for the customer to think over. A quote with a date attached gets accepted. A quote sitting in an inbox gets shopped around.
How does pricing by item protect your margin instead of a square metre guess?
Pricing each item in the job, labour, tile supply, adhesive, membrane, levelling clips, screed and breakage allowance, as its own priced line rather than folding it all into one rate means nothing gets missed and nothing gets guessed. Every component of a bathroom or splashback job is accounted for on its own terms, not absorbed into an average that may or may not reflect that job.
The pricing should also assume the time and material use of an average tradesperson doing that job, not the owner's own efficient habits on a good day. That matters because real jobs include breakage, extra falls work in a shower recess, and time lost waiting on other trades. A rate built on the owner's best day will always come up short on an ordinary one.
How often should a tiler update prices?
Regularly, because every rise in tile, adhesive or membrane cost, or every increase in the day rate a tiler needs to run the business, comes straight off margin the moment pricing falls behind it. Prices set once and left are a slow leak, not a one-off miss.
Picture a tiler whose pricing had been set job by job, varying between a homeowner renovation, a builder's job and a repeat customer, with no consistent rate underneath any of it. Moving to one fixed price list across every type of customer, builders included, with a real increase built in rather than patched around the edges, and reviewing the cost of running the business every quarter, changes the conversation from chasing each job's number to knowing the number before the quote is even written.
What changes when AI agents take on the quoting?
An AI agent is software that does a piece of office work the way the owner would do it, using the tiler's own prices, wording and rules, rather than a generic template. For pricing, that means every job item, waterproofing, screed, tile supply, breakage allowance, gets pulled into a quote consistently, every time, without the owner re-guessing the rate from memory on a Friday afternoon.
This works from the tiler's own data first, not from a feeling about what a job should cost. AI agents can check the margin on a quote against the business's own numbers before it goes out, and flag a job where the margin has slipped below where it needs to be, so the gap gets caught before the job starts, not after the materials are paid for.
How does Data First Coaching approach this?
Data First Coaching starts from the tiler's own job and quoting data through the Trade Business Intelligence, not from a generic pricing rule. It looks at where margin actually leaks, whether that's breakage, waterproofing time, waiting on other trades or a day rate that hasn't moved in a while, and finds where the real problem starts rather than treating the symptom again on the next job.
Greg Allan built his own trade business before building this method, and his approach to pricing is blunt: “We really want to price our items to match the average trades person getting this job done.” The how, the systems and the pricing build, is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member who is open minded, innovative and willing to share what they learn.
Looking for a business coach who starts from your numbers? Tiler Business Coach or every answer for tilers.

