By Greg Allan, tradesman and creator of Data First Coaching
Why does a network approval delay cost more than the time on hold?
Most solar installers treat a slow network approval as the distributor's problem, something to wait out. It is actually a labour cost sitting inside the business the whole time it drags on. The crew is still paid, the office is still following up, and the system size that was quoted assumed none of that time would happen.
A residential install or a commercial solar job that stalls on grid connection does not stop the clock on wages. The job eventually gets finished, the invoice goes out, and on paper it looks like a normal job. What never shows up is the gap between the hours paid and the hours actually billed to get there.
Where does that lost time actually go in a solar install?
It disappears into the job itself, uncounted, because nobody wrote it down as a separate cost. A crew standing by for a go-ahead, an office person on the phone to the network about a stalled application, a return trip to site because the approval landed a day after the crew was booked: none of it is a variation, so none of it is billed.
Multiply that across every battery install, every commercial solar roll-out and every residential system waiting on connection approval in a given month, and the real margin on solar work can sit well below what the original quote assumed. The owner usually does not notice, because revenue still came in and the job still got marked done. The slippage is in the gap between paid hours and billed hours, and that gap rarely gets measured on its own.
What number actually tells a solar installer their real job efficiency?
The number that matters is not how many installs went out this month, it is how many of the hours paid on those installs were actually billed. That includes the inverter commissioning, the panel fit, the paperwork for rebates and certificates, and every hour spent waiting on or chasing a network approval.
Tracked weekly, against what was billed, this is what separates a solar installer who looks busy from one who is actually profitable. A job can be fully staffed, fully quoted and still bleed margin if the time paid on it runs well past what was allowed, and nobody captured the overrun as a cost. This is a data first way of looking at the business: the answer is not in memory or in how hectic the week felt, it is in what the hours actually did against what was billed.
Greg separates this into two different things: job efficiency, which is the time spent actually installing and commissioning, and operational efficiency, which is the paid time that never turns into billable work, like a crew standing by for an approval or office hours spent on a follow-up call. Keeping those on separate lines is what shows a solar installer where the leak really is.
How can AI agents take the chasing and paperwork off the crew?
An AI agent is software that does a job the way the owner would do it themselves, using the owner's own wording, their own pricing and their own rules for following things up. For a solar installer, that can mean an agent that chases a network approval the same way the office would, with the same wording and the same escalation points, without a person having to remember to do it.
That matters because the chasing itself is part of the cost that never gets billed. If an AI agent is doing the status checks and the resubmissions on a routine network approval or certificate, the office person who used to spend an hour a day on it is free for sales, for warranty claims and service calls, and for the next lead instead. The job still needs the human judgement when a network approval genuinely stalls, but the repetitive follow-up does not need to eat a wage.
Should solar installers just build in buffer time for approvals?
Buffer time helps with scheduling, but it does not fix the underlying leak, it only hides it further. Some off-the-shelf job management tools do a reasonable job of tracking scheduling and quoting for a solar installer, and the data from your own jobs will show which of those are worth keeping.
What tends to make the real difference is building the tracking around how your own business actually runs: your system sizes, your typical wait times on grid connection, your own mix of residential and commercial solar, rather than renting a generic tool built for every trade at once. That is a choice to make once the owner can see, from their own numbers, where the paid-but-not-billed hours are actually sitting.
How does Data First Coaching approach this?
Data First Coaching starts from the solar installer's own job data inside the Trade Business Intelligence, not from a conversation about how busy the month felt. It looks first at the gap between hours paid and hours billed across installs, because that gap is usually where a network approval problem is actually a labour efficiency problem wearing a different name. Greg has seen what happens when that gap goes unmeasured for long enough: “there are hundreds of hours of actual time on site over what they've allowed for with no variations, and it was destroyed their business.” The how, including where the agents go and what gets tracked, is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member who joins it.