Why do progress claims keep landing late?
A progress claim usually goes out late not because the client is slow to pay, but because the builder was slow to claim. Most building contracts, whether fixed price or cost plus, set out when a claim can be raised against a milestone such as slab, frame stage or lock-up. The trouble is the work on site rarely lines up neatly with those milestones.
A subcontractor finishes a stage early, a variation gets signed off mid-week, an estimator's allowance for a prime cost item gets used up, and none of it gets written up until the next scheduled claim date. By the time the claim is drawn up, it often covers weeks of work that was already completed. The paperwork is late because the claiming habit is late, not because the client is being difficult.
What does a late progress claim actually cost a builder?
A late progress claim is not just an administration headache, it is gross profit sitting unconverted while the overheads keep running regardless. Once a builder has paid subcontractors for the frame, bought materials on account, and covered the site supervisor's time, that cost has already left the business whether the matching claim has landed or not.
This gap often bites hardest around handover and defect periods, when final claims and retentions already move slower, and around council or certifier inspections, when a hold point can delay the next claimable stage. A renovation or extension running on a tighter contract value feels this faster than a larger new home build, because there is less working capital in the job to absorb the wait.
What number in a builder's own data tells the real story?
The number that matters is not the total value of claims out, it's the value of work completed on site that hasn't been claimed yet, tracked week by week rather than tallied up at the end of the job. That figure tells you exactly how much of your gross profit margin is sitting earned but unconverted at any point in time.
Memory won't give you this honestly, because every job looks fine on the day you're standing on it. It's only when you look across every active contract, fixed price and cost plus side by side, that the pattern shows up: claims consistently running one, two or three weeks behind the work. Data first, not gut feel, is what shows a builder where the gap actually starts, whether that's at frame stage, at variation sign off, or at lock-up.
How do you stop a claim going out late in the first place?
You stop it by building a fixed weekly claiming rhythm into the business, so every hour of billable work gets captured and claimed on a set day, not left until a milestone or until someone remembers. AI agents, which are software that do a job the way you would, with your pricing, your contract wording and your rules, can hold that rhythm for you.
An AI agent can sit in front of the gap between work done and work claimed, so the job can't move into the next week without the claim being drawn up first. That matters because the problem was never really about chasing a slow payer, it was about the claim leaving the office late to begin with. Once an agent is pulling together hours, variations and materials against the contract every week, the claim goes out on time whether the site supervisor is flat out or not.
What do you do when a builder pushes back on agreed payment terms?
Picture a builder doing work for another builder on agreed progress payment terms, only to have that builder push back on paying a claim once it landed, dismissing it outright when it was raised. The agreement on paper meant nothing if it wasn't held to when the invoice fell due.
The way through was to hold firm on the terms that had already been agreed, follow the outstanding claim up until it was paid, and then make a clear decision: finish the current contract, and take no further work from that builder. A progress claim system only holds up if the terms behind it are enforced every time, not just when it suits the other side.
How does Data First Coaching approach this?
Data First Coaching starts with the builder's own numbers, not an explanation of the business, because the Trade Business Intelligence can show where unclaimed work is sitting across every live contract, fixed price and cost plus, before a word is said about what might be going wrong. From there it looks at where the claiming rhythm breaks down, whether that's at variation approval, at a milestone like lock-up, or through the handover and defect period.
As Greg puts it, “we're going to go through and look at all of the hours worth build for or progress claim for the week.” The how of setting that rhythm up with agents is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member who is open minded, innovative and willing to share what they learn.