By Greg Allan, tradesman and creator of Data First Coaching
Why can a bulk earthworks job look profitable on paper but not in the bank?
A bulk earthworks job can show a healthy margin on the quote and still leave the bank account short once the work is done. The gap usually is not bad pricing. It is the cost of meeting a standard or a code of practice landing in overhead instead of against the job that caused it, so the real cost of the site cut or trench never shows against that job.
Certified operator time, plant serviced to standard, and a tipping fee for compliant disposal are all real costs tied to a real job, not background expense. When an earthmoving contractor spreads those costs across the whole business instead of the site cut or trenching job that created them, the gross profit on that job is not an honest number, even when every requirement was met properly on site.
What code of practice covers trenching, site cuts and bulk earthworks?
You work mainly to Safe Work Australia's Excavation Work Code of Practice, which gives practical guidance on managing the health and safety risks of bulk excavations, trenches, shafts and tunnels, covering most of what an earthmoving contractor runs on a civil or drainage job: site cuts, trenching and bulk earthworks for a builder or civil customer.
Where a trench or shaft passes a depth set out in the earlier version of the Code, the work is treated as high risk construction work and a safe work method statement has to be prepared before the dig starts. That SWMS is specific to the job, the ground and the plant on site that day, so the time it takes to prepare and supervise to it belongs against that trenching job, the same way labour and fuel do.
Does an operator need a high risk work licence to run the excavator or bobcat?
In most cases, no. The Excavation Work Code of Practice says a high risk work licence is needed for some types of powered mobile plant, but earthmoving machinery used for the purpose it was designed for generally does not need one, so long as the operator can show competence with that plant and the attachments fitted. WorkSafe Victoria confirms the same position for its own state.
High risk work licences are issued by the WHS regulator in each state and territory, so the exact path can differ depending on where the earthmoving contractor is based and what else travels on the float, such as a crane or an elevating work platform. These sources cover Australia. An earthmoving contractor working in New Zealand should check the equivalent operator and plant rules with WorkSafe New Zealand, since nothing here speaks to New Zealand law.
What about underground services, asbestos and overhead powerlines?
Before an excavator or trencher breaks ground, the location of underground essential services including gas, water, sewerage, telecommunications, electricity and fuel lines has to be established. The Work Health and Safety (Excavation Work) Code of Practice points operators to the Dial Before You Dig organisation in their state or territory, and the excavation code of practice warns of asbestos risk and overhead powerline controls on the same job.
A site cut or trench can bring an operator into contact with material contaminated with asbestos, such as old underground water pipes and telecommunications pits, or naturally occurring asbestos in the ground itself. Where the work runs near overhead powerlines, specific control measures have to be in place before the machine starts, with the relevant authority consulted on approach distances. Every one of those checks takes time: a call to Dial Before You Dig, a wait on clearance near a powerline, extra care and possibly a specialist when asbestos turns up. That time is a cost of that specific job, not a general cost of doing business.
Which standards cover the plant itself, servicing, attachments and quick hitches?
Your plant carries its own set of standards under the duty to provide and maintain safe plant. Safe Work Australia's plant and machinery guidance says registrable plant must be registered, general plant safety sits under the AS 4024.1 series, periodic brake testing refers to AS 2958, and reversing alarm noise draws on ISO 6393, according to the Resources Regulator's mobile and transportable plant guideline.
Attaching a quickhitch to an excavator or backhoe loader brings in AS 4772, and SafeWork SA notes earthmoving equipment such as excavators and front-end loaders is not built to lift a freely suspended load, so any plant used that way has to be specifically designed for it. Servicing to these standards, keeping attachment certification current, and checking a quickhitch before it goes out on dry hire or wet hire all cost real money. When an earthmoving contractor floats a machine between sites and swaps attachments job to job, those servicing and certification costs need to sit against the machine hours on that job, not get buried in a general plant account.
AI agents, pieces of software that do a job the way you would, with your prices, wording and rules, can hold that record for you: which machine was serviced to which standard, which attachment is certified, which job a tipping fee or float time belongs to. Running that paperwork through AI agents, data first, from your own job and plant data rather than memory at the end of the quarter, is what lets you see the true gross profit on a site cut or trenching job before the next quote goes out.
This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.
Where can you check the current rules?
Each of the pages below is where Safe Work Australia, the WHS regulators and SafeWork SA publish the current wording of these codes, licences and standards, so check them directly before relying on a number, since licence lists, depth triggers and standard numbers do get updated over time.
- Excavation Work Code of Practice - Safe Work Australia's current guidance on managing risk in bulk excavations, trenches, shafts and tunnels.
- Earlier Excavation Work Code of Practice - sets out when excavation work becomes high risk construction work requiring a safe work method statement.
- Work Health and Safety (Excavation Work) Code of Practice - covers underground essential services and the Dial Before You Dig organisation.
- High risk work licence, WorkSafe Victoria - explains which plant needs a licensed operator and which does not.
- Plant and machinery, Safe Work Australia - sets out the duty to maintain safe plant and register registrable plant.
- Mobile and transportable plant guideline, Resources Regulator - points to the AS 4024.1 series, AS 2958 and ISO 6393.
- Earthmoving equipment to lift loads, SafeWork SA - covers AS 4772 and lifting loads with earthmoving plant.
How does Data First Coaching approach this?
Greg Allan's Data First Coaching starts from the earthmoving contractor's own job and plant data through the Trade Business Intelligence, not from a list of codes recited from memory. It looks at where servicing, certified operator time and tipping fees actually land in the numbers, and whether that cost sits against the site cut or trenching job that caused it, or quietly inflates overhead so every quote looks better than it is. In a session on plant standards, Greg has asked, “Should we move on to the Australian Construction Code?”, because one standard is rarely the whole story. The how is worked through inside the Academy, with members who are open minded, innovative and willing to share, because the Trade Business Intelligence is powered by every member.