By Greg Allan, tradesman and creator of Data First Coaching
Which code of practice does a demolition contractor work under?
A demolition contractor's base rule is the Demolition Work Code of Practice, which Safe Work Australia publishes as an approved code of practice under the Work Health and Safety Act. It sets out how risk is managed on every job a demolition contractor runs, from a full structural pull-down to an internal strip-out or soft strip, and it applies no matter which state or territory the crew works in.
Under the WHS Regulations, Safe Work Australia's code says “Any work that is connected with the demolition of a structure is classified as ‘construction work’ under the WHS Regulations”, and the same code says this kind of work “is defined by the WHS Regulations as ‘high risk construction work’ and a SWMS must be prepared before this work commences”. Safe Work Australia's demolition code That one classification is why a demolition contractor's paperwork looks different from a renovation builder's: a safe work method statement before the first wall comes down, induction training for the crew, and a licence for whoever is running the excavator, the truck or any other machinery on site.
Does asbestos removal need its own licence?
Yes, and it is one of the first things a demolition contractor has to settle before pricing the job. WorkSafe Tasmania's demolition work code says the business that commissions asbestos removal must make sure the work is carried out by a licensed asbestos removalist, unless the WHS Regulations say a licence is not required. WorkSafe Tasmania's demolition code Safe Work Australia's own code adds that all asbestos likely to be disturbed by the demolition must be identified and, so far as reasonably practicable, removed before the demolition starts, and if it is only a partial strip-out, only the asbestos affected by that part needs to be cleared first.
Which licence class a demolition contractor or its subbie needs depends on how much asbestos is involved and whether it is friable, so this is not something worked out from memory on site. Hazardous waste from an asbestos removal cannot go in the general bin or the mixed waste and recycling skip either. WorkSafe Tasmania says asbestos waste has to be transported and disposed of under the relevant state or territory Environment Protection Authority rules, at a site the EPA has licensed for it, never through the general waste system.
This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.
Does a demolition contractor need a permit or council notification before starting?
Often yes, and the rule depends on where the job is and how big the structure is, not on the label used for the job. Transport for NSW's demolition standard points to a requirement to notify SafeWork NSW in writing ahead of demolition work involving a structure above a stated height, machinery working on a suspended floor, or the use of explosives, with the current notice period set out in the WHS Regulation. Transport for NSW's demolition standard In Western Australia, WorkSafe says a demolition licence is required for demolishing or dismantling a structure above a stated height that is not a single storey dwelling, or a fence or wall above a stated height, and a copy of the notification form has to be kept on site along with the workplan and the Australian Standard. WorkSafe WA's demolition page
Council planning rules sit alongside the WHS and licence rules, not instead of them. NSW Planning's own guidance on demolition as exempt development says the work must still be carried out in accordance with Australian Standard 2601-2001, even when council planning approval is not required. NSW Planning's demolition rules A demolition contractor working near a neighbour's fence, boundary wall or shared driveway also has to manage dust, noise and falling material under the same code, which is where hoardings, site safety fencing and overhead protection come from.
Which Australian Standards sit behind the WHS rules?
The standard a demolition contractor keeps coming back to is AS 2601-2001, The demolition of structures, which Safe Work Australia's code says “For further information refer to AS 2601-2001: The demolition of structures.” Demolition Work Code of Practice WorkSafe WA says a copy of this standard has to be kept at the demolition site alongside the notification form and the workplan.
Where explosives are used to bring a structure down, a second standard applies: AS 2187.2, Explosives - Storage and use, alongside AS 2601. Transport for NSW's standard also points a demolition contractor to the Explosives Act, the Explosives Regulation, the Work Health and Safety Regulation and the Australian Code for the Transport of Explosives by Road and Rail for that type of job. Which of these apply to a given demolition contractor depends on the state the job is in and the method used, so this is one to confirm per job, not once and forget.
Where does this cost a demolition contractor time, and what changes with AI agents?
Every one of these obligations produces paperwork: a SWMS, an asbestos register, a notification letter, a workplan, a licence check for the crew and the plant, a record of where the waste and the salvage went. For most demolition contractors that paperwork gets done from memory the night before a job starts, which is exactly when a detail gets missed, because the real answer sits in last month's job files, not in anyone's head.
The number that holds the truth here is not a feeling about how you always do it. It is the pattern across your own past jobs: which sites needed a licensed asbestos removalist and which didn't, which jobs needed council or SafeWork notice and which were exempt, how long the notice period actually took against how long you left yourself, and where a tipping docket or an EPA disposal record was missing when someone asked for it later. That pattern lives in your own job and site records, and it is more reliable than memory of how the last run of demolition jobs went.
This is where AI agents change the office work rather than the site work. An AI agent is software that does a job the way you do it, with your prices, wording and rules, so it can check a new job against your own past jobs: has the asbestos register been started, has the licence been confirmed for the structure's height, has the council or SafeWork notice gone out with enough days up its sleeve. AI agents can also hold the waste and recycling paperwork straight, so the tipping docket, the EPA disposal record for anything hazardous and the salvage record are all sitting against the job the day it finishes, not chased up a quarter later. That is data first: the rule gets checked against your own numbers before the excavator turns up, not after a council letter arrives.
Where can you check the current rules?
- Demolition work Code of Practice (Safe Work Australia), the national code of practice on managing risk in demolition work, including asbestos, SWMS and plant licensing.
- Safe Work Australia's earlier demolition code, sets out how demolition is classified as high risk construction work requiring a SWMS.
- WorkSafe Tasmania's demolition code, covers asbestos removal licensing and hazardous waste disposal.
- Transport for NSW's demolition standard, covers notification timing, special structures and explosives for NSW demolition work.
- WorkSafe WA's demolition page, covers WA's demolition licence requirements and site documentation.
- NSW Planning's demolition rules, covers when council approval is not required and what standard still applies.
How does Data First Coaching approach this?
Data First Coaching does not start by asking a demolition contractor to list which jobs went smoothly and which didn't. Greg Allan starts from the owner's own job and site records, through the Trade Business Intelligence, to see which jobs needed a licensed removalist, which needed council or SafeWork notice, and where the paperwork trail broke down last time. That is usually where the real cost sits, not in the code of practice itself. Working out how to build the checks and the agents that hold this straight for your own jobs is covered inside the Academy, with other members, because the Trade Business Intelligence gets sharper with every member who is open minded, innovative and willing to share what they find.