By Greg Allan, tradesman and creator of Data First Coaching
Which Australian Standards does a bricklaying business work to?
A bricklaying business doesn't work to one code, it works to a stack of them depending on the job. The core one is AS 3700 for masonry structures, which sets the standard for the strength, bracing and tolerances of your brickwork and blockwork. Damp course and flashing can be built to AS 3700, to AS 4773 Parts 1 and 2, or to the ABCB Housing Provisions, as set out by the Building Commission's damp course guidance.
Footings and slabs sit under AS 2870, according to the Victorian Building Practitioners Guide to Standards and Tolerances, windows under AS 2047, and the scaffold your crew builds off sits under AS/NZS 1576. The National Construction Code's weatherproofing provisions also carry state variations, so a detail that satisfies the code in one state does not automatically satisfy it in another. A brickie quoting a job in one council area cannot assume the same detail will pass on the next site.
Where does the real cost of these standards actually hide?
The standard itself is rarely the problem for a bricklaying business. The problem is the extra course, extra lift or extra damp course and flashing that a council inspector or a builder's spec adds mid job, built on the day rate that was already quoted for a straight run of face brick.
Picture a bricklayer quoted on a day rate for a garden retaining wall and a run of face brick to the front elevation. Halfway through, the builder's engineer calls for a deeper footing and an extra course of blockwork below ground because the soil report came back reactive. The bricklayer and the labourer mixing and loading out keep working, because stopping to argue scope feels like it will slow the job down and annoy the builder they subcontract to every month.
That extra footing, extra lift and extra cleaning down at the end of the day never gets written up as a variation. It gets absorbed into the price that was agreed before any of it was known. Done often enough, across enough sites, it is one of the quiet reasons a bricklaying business can be flat out every week and still not get ahead.
Why does the National Construction Code keep changing on bricklayers?
Because the code itself gets amended, and the state variations under it change what counts as compliant. The NCC's weatherproofing provisions for masonry list which Australian Standard satisfies the deemed to satisfy pathway, and note that some materials accepted elsewhere are not accepted for damp proof courses in South Australia, under the NCC's own weatherproofing of masonry page.
WorkSafe Victoria's safety alert on masonry instability says builders, bricklayer contractors and employers involved in building or altering masonry structures must keep those walls stable through the build and able to withstand weather, and points to AS 3700 for guidance on bracing during construction, as set out on WorkSafe Victoria's masonry safety alert. Safe Work Australia's model code of practice on falls also requires that scaffolds above a set height be erected, altered and dismantled only by a licensed scaffolder, under the Managing the risk of falls Code of Practice. None of this is optional for a bricklaying business working at height, and none of it stays still for long.
How do you price for a standard before you build it?
You check the margin on the extra before the crew builds it, the same way you'd check it before quoting the job in the first place. If a council detail or a builder's spec calls for an extra lift, a deeper footing, or extra damp course and flashing beyond what you priced, that is new scope.
Before the labourer mixes another batch or loads out another pallet of brick, work out what the extra course or lift does to the gross profit margin on that job. Write it up as a variation and get the builder to confirm it before the next lift goes up on site, not after it's cleaned down and invoiced. A bricklaying business that treats every standards-driven extra as billable work, rather than something a good brickie just gets on with, protects the margin the quote was built on.
What changes when an AI agent tracks this for you?
An AI agent is software that does a job the way you would, using your own prices, your own wording and your own rules, so it can watch for these moments without you having to carry every clause of AS 3700 or AS 4773 in your head. AI agents can sit across your quoting and job files and flag any spec that calls up a standard or the National Construction Code, so the extra footing or extra flashing gets raised as a variation before the crew builds it.
Because the agent works from your own job and pricing data, data first, rather than from memory at invoicing time, it catches the gap between what was quoted and what the standard actually required while there's still time to put it in writing. That is the difference between a bricklaying business that absorbs every tightened code silently and one that prices for it, job after job.
This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.
Where can you check the current rules?
- Damp proof courses and flashing installation in masonry construction covers which standard applies to damp course and flashing by building class.
- Guide to Standards and Tolerances covers footing, slab and masonry tolerances under AS 2870 and AS 3700.
- Managing the risk of falls at workplaces Code of Practice covers scaffold standards and licensing for high risk scaffold work.
- Bricklaying work licensing covers contractor licensing and qualifications for bricklaying in New South Wales.
- Masonry structures, instability leads to collapse covers bracing and stability obligations during construction.
- Part 3.3.4 Weatherproofing of Masonry covers National Construction Code requirements and state variations.
- More information, masonry wall safety lists the full set of standards referenced for masonry construction in New South Wales.
How does Data First Coaching approach this?
Greg Allan's Data First Coaching starts from the owner's own job and pricing data through the Trade Business Intelligence, not from a general list of standards, because the real question is never which code applies, it's which jobs quietly absorbed extra scope the code required and never got charged for. Greg has seen the same gap in his own numbers before coaching anyone else's: “working out your hourly rates and your overheads and stuff, and we didn't quite get that dialed in.” He also reminds members that “there's changes to the construction code,” so what was absorbed last year keeps shifting. The how, finding that gap in your own data and building the system that catches it, is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member who is open minded, innovative and willing to share.