Articles

What work health and safety duties does the owner of an earthmoving business have in Australia?

An earthmoving contractor running the business holds duties under Australia’s harmonised work health and safety laws as a “person conducting a business or undertaking” (PCBU): providing a safe work environment, safe plant such as excavators and attachments, competent operators, and specific controls for excavation and trenching work, including checking underground services before digging starts. These duties sit with the owner personally, enforced by the state or territory regulator.

Places in the Academy are limited. 9,000+ owners trained, 4.9 stars from 123 Google reviews.

  • Data first coaching
  • Your nights back
  • Every job priced to make money
  • 9,000+ owners trained
  • Greg is the only coach
  • 20 years in trade, 10 coaching
  • Beat 9pm
  • Places are limited
Greg on videoDecember work rush destroys quality and burns out your team

By Greg Allan, tradesman and creator of Data First Coaching

Why does WHS duty matter more than paperwork on an earthmoving site?

Most incidents on an earthmoving site do not start with a missing form. They start when a job runs long and the owner decides to push through anyway: an operator kept on the excavator through a wet-day catch-up, a rock breaking job rushed to beat a tipping fee cutoff, a breakdown patched up under pressure so the float can keep moving. These are the conditions where someone gets hurt, and where the owner’s duty actually lives.

For an earthmoving contractor, the trench that is not shored properly because the crew is behind, the site cut finished in failing light, or the machine hours logged past a service that was already due, are not separate problems from the business. They are the business, because the owner conducting it carries the duty under work health and safety law, not just the machine or the method statement sitting in a folder.

What is the primary duty of an earthmoving contractor as a PCBU?

Under Australia’s harmonised work health and safety laws, an earthmoving contractor running the business is a person conducting a business or undertaking, a PCBU, and carries a primary duty to provide a safe work environment, safe plant, safe systems of work, and the training and supervision the crew needs to do the job safely. According to Safe Work Australia’s page on duties of a PCBU, that duty extends to managing risks to a worker’s psychological health too.

This duty sits with the owner even when work is subcontracted out, machines are on wet hire, or an operator is a subbie running one of the business’s attachments. It covers the excavator, the tipper, the bobcat, servicing schedules and the systems the crew follows on every site cut or bulk earthworks job. Victoria sits outside the harmonised WHS Act, under its own OHS laws, and WorkSafe Victoria’s page on employer legal duties sets out the same core obligations there: safe plant, safe systems of work, and the information, instruction, training and supervision needed to do the work safely.

What duties apply specifically to excavation and trenching work?

Excavation and trenching carry duties beyond the general PCBU duty, because the risks of collapse, buried services and plant working close to people are well documented. Before an earthmoving contractor starts digging, the business with management or control of the workplace must take reasonable steps to find current underground services information and pass it on to anyone engaged to carry out the excavation work, as set out in the Work Health and Safety (Excavation Work) Code of Practice 2015.

SafeWork NSW’s page on excavations and earthmoving plant is direct about the starting point: before any excavation begins, the business must check with Before You Dig Australia so the location of services is known before the bucket goes in. The Excavation Work Code of Practice also sets out duties for workers themselves, who must take reasonable care for their own health and safety, not adversely affect others, and follow reasonable instructions and procedures on site. Excavation work classed as high risk construction work generally requires a safe work method statement before work starts, a duty that sits with the PCBU in control of the work.

What duties apply to plant, machines and operators?

An earthmoving contractor’s duty does not stop once an excavator or bobcat is on site. It covers how that plant is maintained, who is allowed to operate it, and how risks around moving machinery are managed. According to SafeWork NSW, a PCBU must manage the risks associated with moving plant, keep plant adequately maintained, ensure operators are competent and properly trained, and put controls in place, such as alarms, sensors or physical separation, to keep workers clear of machines in motion.

Operator competency is its own duty, separate from maintenance. The Managing the risks of plant in the workplace Code of Practice requires the business to ensure, so far as reasonably practicable, the safe use, handling, storage and transport of plant, which covers floating machines between sites as much as running them on site. Where an excavator is used as a crane, for example lifting pipe into a trench, that work is classed as high risk construction work requiring its own safe work method statement, and the operator may need a specific high risk work licence, as explained in Safe Work Australia’s information sheet on powered mobile plant used as a crane. Licensing detail also varies by state: in Queensland, operators no longer need to hold an earthmoving or particular crane certificate for some classes of equipment, but WorkSafe Queensland is clear the PCBU with management or control of the plant still has to ensure operators are competent, trained and supervised. What applies in one state is not guaranteed to apply the same way everywhere, which is worth checking against the regulator for wherever the earthmoving contractor is working.

This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.

How does this duty show up in the owner’s own data?

An earthmoving contractor’s WHS obligations are not only legal, they are operational: service intervals, operator records, SWMS, toolbox talks and machine hours are all data the business already generates. The real question is whether anyone checks that data before a job runs long, rather than after something goes wrong. A decision to keep pushing an operator through a wet-day catch-up made on memory, or on a feeling that it will be fine, is usually made without the service log, the hours since last maintenance, or the hours that operator has already run that week sitting in front of the owner.

Data first thinking applies here the same way it applies to pricing or scheduling: the owner’s own numbers, checked as the job runs, tell the truth that memory does not. An AI agent is software that does a job the way the owner would, with their prices, wording and rules. Set against the plant and job diary, an agent can flag when a machine is approaching a service, when an operator’s hours on a site cut are stacking up, or when a float booking is about to push a crew past a sensible day. A second AI agent can keep SWMS and training records current against the jobs actually booked in, rather than a folder updated once a year. None of that replaces judgement on site. It means the warning sits in front of the owner before the decision to push on gets made, not after.

Where can you check the current rules?

How does Data First Coaching approach this?

Data First Coaching starts from the earthmoving contractor’s own job and plant data through the Trade Business Intelligence, not from a generic safety checklist. Greg looks at machine hours, service records, operator rosters and job diaries to find where schedule pressure is already pushing people past sensible limits, because that is usually where the real risk sits, not in a missing document. Greg teaches it like this: “if you drop the glass ball, it scratches it and that scratch will never come out”, and applies that to the crew and the owner, not only to a customer relationship. The how, the systems and the build are worked through inside the Academy, with members who are open minded, innovative and willing to share, because the Trade Business Intelligence is powered by every member.

Also asked

More questions owners ask.

Does an earthmoving contractor need a safe work method statement for every job?

Not every job needs one, but excavation and plant work classed as high risk construction work generally does, before the work starts. Whether a given site cut, trench or lift falls into that category depends on the work itself, so check the specific code of practice linked above or ask the regulator for that job.

Who holds the WHS duty when a machine is on wet hire or dry hire?

The PCBU duty follows management and control of the work, not just ownership of the machine. On wet hire the operator may be supplied by another business, and on dry hire the earthmoving contractor supplies the operator, so who carries which duty can depend on the arrangement and is worth clarifying in writing before the job starts.

Does an operator still need a licence to run an excavator in Australia?

Licence requirements vary by state and by the type of work. Some states have removed certificate requirements for certain classes of earthmoving plant, but the business still has to ensure the operator is competent, trained and supervised, and extra licensing can apply where plant is used as a crane.

What happens if an earthmoving contractor does not check for underground services before digging?

Several sources above set out a clear duty to find and pass on current underground services information before excavation starts. Skipping that step is a direct gap against that duty, separate from whatever damage or injury follows, so it is worth building into how every site cut or trenching job is planned.

Data First Coaching

Coaching That Starts From Your Data.

Data First Coaching is the trade business coaching method created by Greg Allan, founder of Tradies Success Academy. Before any advice is given, the Trade Business Intelligence Agent reads the owner's own job management and finance data, so the coaching starts from what the numbers show this week, not from what the owner can remember or explain. It finds the root cause of a problem, then puts in the system that fixes it.

How most coaching works

Most coaching starts with the owner explaining the business.

  • The first hours go on the owner describing the business to a coach.
  • The picture is out of date within weeks, because the numbers move every week.
  • So the advice treats what the owner happened to notice, which is usually a symptom.
  • Too often it comes from someone who has never run a trade business, or has only just started one.
  • The owner pays for the explaining, then pays again when the advice does not fit.

Data First Coaching

Data first starts from your numbers, not your memory.

  • The Trade Business Intelligence Agent reads your job management and finance systems first.
  • It sees your quotes, jobs, time on site and money as they are this week, not as you remember them.
  • It finds where the problem actually starts, not where it shows up.
  • You put in the system that fixes it at the root, and the data shows whether it worked.
Typical coaching against Data First Coaching
Typical coachingData First Coaching
Where it startsYou explain the businessYour own job and finance data
How current it isAs at the last meetingUpdated as your numbers change each week
What it fixesThe symptom you noticedThe root cause the data shows
Who coaches youOften someone who has never run a trade businessGreg Allan, who built a trade business a general manager now runs
The answer to growthUsually another wageAgents on the office work, people on customers and the crew
Your softwareAnother subscription or agencyTools you build on your own data, around how you work

Fix the root cause, once

The data names the real problem, so the system you put in fixes it once instead of patching the same symptom every month.

Own your software

Build your own tools on your own data, shaped around how your jobs run and how your customers buy. Cancel the subscriptions and agencies that were never built for your business.

A more human business

Agents do the non-billable work: the quoting, invoicing, chasing and reporting. Your people spend the day on customers and the crew, so relationships get better and the team performs.

Why Greg

You speak to the owner who has already done it.

Greg built Response Electricians in Perth into a 30+ staff business with 1,950+ five-star reviews. A general manager runs it.

He has trained 9,000+ trade business owners across Australia and New Zealand.

He grew a coaching company to 35 staff, a CEO and 15 coaches, then cut it back so every owner deals with him directly.

Most coaching companies hand you to a salesperson, then to a coach who has never run a trade business. Here you get the owner.

The Academy is in demand because it works, and Greg keeps places limited on purpose so every business gets looked at properly, by him. He reads every application himself, interviews the owners who fit and only takes on owners who are building for the right reasons and give back to the group. Apply now and he'll be in touch when a place opens.

Illustration: a trade business owner standing over three office staff buried in paperwork at night.
The old way

More customers meant more people doing the computer work, and more wages nobody invoices.

Illustration: a tradesman shaking hands with a homeowner in her driveway, his phone showing jobs quoted and invoiced.
The new way

You stay with your customers and your team. The office stops landing on you.

The old way

More jobs. More paperwork. Less of the owner left.

Most trade businesses grow the same way.

More jobs means more quoting, invoicing, chasing and scheduling.

None of it gets paid for.

So the owner does it at night, after a full day on site.

Or hires an office person to do it.

The office grows. The wages grow. The margin does not.

And the owner is still the one everything waits on.

Where we take you

More work. More profit. More of you left.

The phone rings with the jobs you want, at the price you set.

You grow when you're ready, never faster than the business can carry.

Every job is priced to make money, so the busy months show up in the bank.

The best tradies in your area want to work for you, and they stay.

The chasing, the paperwork and the 9pm admin stop landing on you.

The business runs the day. You pick which parts of it you're in.

Bigger, without the headaches. Getting bigger stops meaning getting busier.

P.S.

P.S. Applying costs nothing and there is no obligation. While you wait, the Tradies App is free for trade business owners, so you can start on the lessons tonight.