Articles

What work health and safety duties does the owner of a demolition business have in Australia?

As a demolition contractor you are a PCBU under work health and safety law, so you carry the primary duty to eliminate or minimise risks on every job, from soft strip to full structural demolition. That duty covers your crew, your subbies, your machinery and the public on site, and it sits alongside separate duties around asbestos, licensing and notification that apply before the excavator ever starts.

Places in the Academy are limited. 9,000+ owners trained, 4.9 stars from 123 Google reviews.

  • Data first coaching
  • Your nights back
  • Every job priced to make money
  • 9,000+ owners trained
  • Greg is the only coach
  • 20 years in trade, 10 coaching
  • Beat 9pm
  • Places are limited

By Greg Allan, tradesman and creator of Data First Coaching

What are your core work health and safety duties running a demolition business?

As a demolition contractor you are a person conducting a business or undertaking, a PCBU, and that status carries the primary duty of care. According to Safe Work Australia's Demolition work Code of Practice, a PCBU must eliminate risks arising from demolition work, or if that is not reasonably practicable, minimise them so far as is reasonably practicable, and this covers hazardous chemicals, airborne contaminants and plant.

That duty runs through the whole job, not just the day the excavator turns up. It covers site safety planning before the job starts, the dust and noise that affect the neighbour next door, the truck movements in and out, and what happens to the waste once the bin is full. If you hold an officer role, for example as a director, you also carry a personal duty under WHS Act section 27 to exercise due diligence, which means taking reasonable steps to make sure the business actually has and uses the right resources and processes, not just a folder of paperwork nobody reads.

Other people on or near the site carry duties too. Safe Work Australia's code notes that visitors and other persons at the workplace must take reasonable care for their own safety and must follow reasonable PCBU instructions, which matters when a demolition contractor is working close to a council footpath, a neighbouring property or a live street.

What extra duties do you have around asbestos on a demolition or strip-out job?

Asbestos duties sit on top of your general PCBU duties and apply before any removal or structural work begins. Under Safe Work Australia's demolition duties page, a PCBU must obtain and check the asbestos register before work starts, and if there is no register, a competent person must inspect the structure, with any asbestos that the demolition work may disturb removed before demolition can begin.

Asbestos removal itself is a separate job to the demolition. According to the Demolition work Code of Practice, the PCBU that commissions the asbestos removal must ensure it is carried out by an appropriately licensed asbestos removalist, unless the WHS Regulations say a licence is not required for that work. WorkSafe Victoria's case study on asbestos removal in domestic demolition sets out matching duties under the OHS Act for employers, self-employed people and anyone with management or control of the site, including making sure demolition does not start until it has been determined whether asbestos is present.

For a demolition contractor doing residential strip-out and knockdown work, this is often where the real risk sits. A soft strip on an older house can turn up hazardous material the quote never priced for, and the duty to check before you disturb it sits with the business, not the client.

Do you or your crew need a licence to carry out demolition work?

In most cases, yes, and the licence sits with specific demolition work, not with the business generally. SafeWork SA's code says a licence is required to undertake some demolition work, and a PCBU controlling the workplace needs to check with the local WHS regulator or building regulator about whether the work in front of them needs one.

WorkSafe Queensland is direct about the consequence: a PCBU must not carry out demolition work, or direct a worker to carry it out, unless they are licensed for that work, and the person nominated to supervise under the licence must be readily available to the crew on site, with the licence-holding PCBU responsible for training workers to do the work safely and competently. See WorkSafe Queensland's demolition page for how that applies.

Machinery brings its own paperwork too. Where powered mobile plant such as an excavator, crane or bulldozer is used, SafeWork SA's code confirms a safe work method statement, a SWMS, must be prepared before work commences, and under WHS Regulation 300 a PCBU must stop high risk construction work immediately if it is not being carried out in line with that SWMS.

Do you have to notify anyone before you start knocking a building down?

Often, yes. Safe Work Australia's demolition safety topic page says certain demolition work is notifiable, including demolishing a structure or load-bearing part of a structure that meets a height the regulator sets, shifting machinery on a suspended floor, or using explosives, with the WHS regulator needing notice ahead of time. The exact height and notice period are on that page and change from time to time, so check it directly rather than working from memory.

In Queensland this notice is made using a specific form. WorkSafe Queensland names it as Form 65, the Notification of licensed asbestos removal work, demolition work or emergency demolition, which a PCBU lodges before starting the listed types of demolition work. This sits alongside, not instead of, your permit and approval obligations with the local council for the actual demolition.

What has changed for demolition licence holders in New South Wales?

If you or your supervisors hold a demolition licence in New South Wales, there is a new training requirement to check. According to SafeWork NSW, a demolition worker must have completed a SafeWork NSW approved course, unit of competency CPCCDE3016, Identify hazards on demolition sites, with CPCCWHS2001 as the pre-requisite, as part of what is required of licence holders and named supervisors.

This is the kind of change a demolition contractor can miss because it affects the licence and the crew's training records, not the quote or the invoice. If your business works across state lines, the licensing and training rules for your crew can differ by state, so check with the regulator in the state the job is in rather than assuming your home state's rules travel with you.

What does this mean for your paperwork and your time on every job?

Every duty above produces a record, and the real question for a demolition contractor is whether those records come from the job as it happens or get reconstructed from memory once the regulator or an insurer asks. A SWMS written to match the actual site, an asbestos register checked before the soft strip starts, a licence and training record that is actually current for the crew on site, these are strongest when they are built from your own job data as the job runs, not pulled together after the fact.

This is where data first thinking changes the job for a demolition contractor. Instead of the quote, the permit, the asbestos check and the SWMS living in different folders, the owner's own data, what was quoted, what was found on site, who was rostered, what licence each crew member holds, becomes the single source that paperwork gets built from.

AI agents can carry a good share of that load. An AI agent is software that does a job the way you would do it yourself, using your prices, your wording and your rules, so it can draft the notification details, chase the asbestos register before a strip-out starts, or flag that a crew member's licence record needs updating before they are rostered on a job that needs it. AI agents do not remove the duty, that still sits with the PCBU, but they take the non-billable paperwork off the owner's plate so the time goes back into running the site and managing the crew.

This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.

Where can you check the current rules?

How does Data First Coaching approach this?

Data First Coaching, built by Greg Allan, starts from the demolition contractor's own job and crew data rather than a general checklist. Through the Trade Business Intelligence, it looks at where a WHS or licensing gap actually starts, whether that is at quoting, at crew rostering, or at how asbestos checks and SWMS get recorded on site, because a symptom like a missed notification is usually a sign the paperwork is built too late to catch it. The how, the systems and the builds that fix that are worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member and the Academy is built for owners who are open minded, innovative and willing to share what they learn.

Also asked

More questions owners ask.

Does a demolition contractor need a different kind of insurance to a general builder?

Insurance requirements are not set by WHS law, they depend on your insurer and the type of demolition, asbestos and plant work you carry out. Check with your insurer and the regulators linked above, since your licence category and the work you are notifying can affect what cover you are expected to hold.

Who is responsible for safety if a demolition subbie is running the excavator on my site?

The PCBU duty can sit with more than one business at once, so both the business engaging the subbie and the subbie's own business can carry WHS duties on the same job. The Demolition work Code of Practice linked above sets out how these duties can overlap, so check it against your own contracting arrangement.

Do these WHS duties change for a small internal strip-out job compared to a full structural demolition?

The PCBU duty to eliminate or minimise risk applies regardless of job size, but specific obligations like notification, licensing and SWMS requirements depend on the type of work, not the size of the invoice. Check the linked Safe Work Australia and state regulator pages for how a job is classified.

Does New Zealand have the same demolition WHS rules as Australia?

No. The sources above are all Australian WHS regulators and codes, and New Zealand runs its own health and safety and licensing framework through WorkSafe New Zealand. A demolition contractor working across both countries should check each regulator separately rather than applying one country's rules to the other.

Data First Coaching

Coaching That Starts From Your Data.

Data First Coaching is the trade business coaching method created by Greg Allan, founder of Tradies Success Academy. Before any advice is given, the Trade Business Intelligence Agent reads the owner's own job management and finance data, so the coaching starts from what the numbers show this week, not from what the owner can remember or explain. It finds the root cause of a problem, then puts in the system that fixes it.

How most coaching works

Most coaching starts with the owner explaining the business.

  • The first hours go on the owner describing the business to a coach.
  • The picture is out of date within weeks, because the numbers move every week.
  • So the advice treats what the owner happened to notice, which is usually a symptom.
  • Too often it comes from someone who has never run a trade business, or has only just started one.
  • The owner pays for the explaining, then pays again when the advice does not fit.

Data First Coaching

Data first starts from your numbers, not your memory.

  • The Trade Business Intelligence Agent reads your job management and finance systems first.
  • It sees your quotes, jobs, time on site and money as they are this week, not as you remember them.
  • It finds where the problem actually starts, not where it shows up.
  • You put in the system that fixes it at the root, and the data shows whether it worked.
Typical coaching against Data First Coaching
Typical coachingData First Coaching
Where it startsYou explain the businessYour own job and finance data
How current it isAs at the last meetingUpdated as your numbers change each week
What it fixesThe symptom you noticedThe root cause the data shows
Who coaches youOften someone who has never run a trade businessGreg Allan, who built a trade business a general manager now runs
The answer to growthUsually another wageAgents on the office work, people on customers and the crew
Your softwareAnother subscription or agencyTools you build on your own data, around how you work

Fix the root cause, once

The data names the real problem, so the system you put in fixes it once instead of patching the same symptom every month.

Own your software

Build your own tools on your own data, shaped around how your jobs run and how your customers buy. Cancel the subscriptions and agencies that were never built for your business.

A more human business

Agents do the non-billable work: the quoting, invoicing, chasing and reporting. Your people spend the day on customers and the crew, so relationships get better and the team performs.

Why Greg

You speak to the owner who has already done it.

Greg built Response Electricians in Perth into a 30+ staff business with 1,950+ five-star reviews. A general manager runs it.

He has trained 9,000+ trade business owners across Australia and New Zealand.

He grew a coaching company to 35 staff, a CEO and 15 coaches, then cut it back so every owner deals with him directly.

Most coaching companies hand you to a salesperson, then to a coach who has never run a trade business. Here you get the owner.

The Academy is in demand because it works, and Greg keeps places limited on purpose so every business gets looked at properly, by him. He reads every application himself, interviews the owners who fit and only takes on owners who are building for the right reasons and give back to the group. Apply now and he'll be in touch when a place opens.

Illustration: a trade business owner standing over three office staff buried in paperwork at night.
The old way

More customers meant more people doing the computer work, and more wages nobody invoices.

Illustration: a tradesman shaking hands with a homeowner in her driveway, his phone showing jobs quoted and invoiced.
The new way

You stay with your customers and your team. The office stops landing on you.

The old way

More jobs. More paperwork. Less of the owner left.

Most trade businesses grow the same way.

More jobs means more quoting, invoicing, chasing and scheduling.

None of it gets paid for.

So the owner does it at night, after a full day on site.

Or hires an office person to do it.

The office grows. The wages grow. The margin does not.

And the owner is still the one everything waits on.

Where we take you

More work. More profit. More of you left.

The phone rings with the jobs you want, at the price you set.

You grow when you're ready, never faster than the business can carry.

Every job is priced to make money, so the busy months show up in the bank.

The best tradies in your area want to work for you, and they stay.

The chasing, the paperwork and the 9pm admin stop landing on you.

The business runs the day. You pick which parts of it you're in.

Bigger, without the headaches. Getting bigger stops meaning getting busier.

P.S.

P.S. Applying costs nothing and there is no obligation. While you wait, the Tradies App is free for trade business owners, so you can start on the lessons tonight.