By Greg Allan, tradesman and creator of Data First Coaching
What are your core work health and safety duties running a demolition business?
As a demolition contractor you are a person conducting a business or undertaking, a PCBU, and that status carries the primary duty of care. According to Safe Work Australia's Demolition work Code of Practice, a PCBU must eliminate risks arising from demolition work, or if that is not reasonably practicable, minimise them so far as is reasonably practicable, and this covers hazardous chemicals, airborne contaminants and plant.
That duty runs through the whole job, not just the day the excavator turns up. It covers site safety planning before the job starts, the dust and noise that affect the neighbour next door, the truck movements in and out, and what happens to the waste once the bin is full. If you hold an officer role, for example as a director, you also carry a personal duty under WHS Act section 27 to exercise due diligence, which means taking reasonable steps to make sure the business actually has and uses the right resources and processes, not just a folder of paperwork nobody reads.
Other people on or near the site carry duties too. Safe Work Australia's code notes that visitors and other persons at the workplace must take reasonable care for their own safety and must follow reasonable PCBU instructions, which matters when a demolition contractor is working close to a council footpath, a neighbouring property or a live street.
What extra duties do you have around asbestos on a demolition or strip-out job?
Asbestos duties sit on top of your general PCBU duties and apply before any removal or structural work begins. Under Safe Work Australia's demolition duties page, a PCBU must obtain and check the asbestos register before work starts, and if there is no register, a competent person must inspect the structure, with any asbestos that the demolition work may disturb removed before demolition can begin.
Asbestos removal itself is a separate job to the demolition. According to the Demolition work Code of Practice, the PCBU that commissions the asbestos removal must ensure it is carried out by an appropriately licensed asbestos removalist, unless the WHS Regulations say a licence is not required for that work. WorkSafe Victoria's case study on asbestos removal in domestic demolition sets out matching duties under the OHS Act for employers, self-employed people and anyone with management or control of the site, including making sure demolition does not start until it has been determined whether asbestos is present.
For a demolition contractor doing residential strip-out and knockdown work, this is often where the real risk sits. A soft strip on an older house can turn up hazardous material the quote never priced for, and the duty to check before you disturb it sits with the business, not the client.
Do you or your crew need a licence to carry out demolition work?
In most cases, yes, and the licence sits with specific demolition work, not with the business generally. SafeWork SA's code says a licence is required to undertake some demolition work, and a PCBU controlling the workplace needs to check with the local WHS regulator or building regulator about whether the work in front of them needs one.
WorkSafe Queensland is direct about the consequence: a PCBU must not carry out demolition work, or direct a worker to carry it out, unless they are licensed for that work, and the person nominated to supervise under the licence must be readily available to the crew on site, with the licence-holding PCBU responsible for training workers to do the work safely and competently. See WorkSafe Queensland's demolition page for how that applies.
Machinery brings its own paperwork too. Where powered mobile plant such as an excavator, crane or bulldozer is used, SafeWork SA's code confirms a safe work method statement, a SWMS, must be prepared before work commences, and under WHS Regulation 300 a PCBU must stop high risk construction work immediately if it is not being carried out in line with that SWMS.
Do you have to notify anyone before you start knocking a building down?
Often, yes. Safe Work Australia's demolition safety topic page says certain demolition work is notifiable, including demolishing a structure or load-bearing part of a structure that meets a height the regulator sets, shifting machinery on a suspended floor, or using explosives, with the WHS regulator needing notice ahead of time. The exact height and notice period are on that page and change from time to time, so check it directly rather than working from memory.
In Queensland this notice is made using a specific form. WorkSafe Queensland names it as Form 65, the Notification of licensed asbestos removal work, demolition work or emergency demolition, which a PCBU lodges before starting the listed types of demolition work. This sits alongside, not instead of, your permit and approval obligations with the local council for the actual demolition.
What has changed for demolition licence holders in New South Wales?
If you or your supervisors hold a demolition licence in New South Wales, there is a new training requirement to check. According to SafeWork NSW, a demolition worker must have completed a SafeWork NSW approved course, unit of competency CPCCDE3016, Identify hazards on demolition sites, with CPCCWHS2001 as the pre-requisite, as part of what is required of licence holders and named supervisors.
This is the kind of change a demolition contractor can miss because it affects the licence and the crew's training records, not the quote or the invoice. If your business works across state lines, the licensing and training rules for your crew can differ by state, so check with the regulator in the state the job is in rather than assuming your home state's rules travel with you.
What does this mean for your paperwork and your time on every job?
Every duty above produces a record, and the real question for a demolition contractor is whether those records come from the job as it happens or get reconstructed from memory once the regulator or an insurer asks. A SWMS written to match the actual site, an asbestos register checked before the soft strip starts, a licence and training record that is actually current for the crew on site, these are strongest when they are built from your own job data as the job runs, not pulled together after the fact.
This is where data first thinking changes the job for a demolition contractor. Instead of the quote, the permit, the asbestos check and the SWMS living in different folders, the owner's own data, what was quoted, what was found on site, who was rostered, what licence each crew member holds, becomes the single source that paperwork gets built from.
AI agents can carry a good share of that load. An AI agent is software that does a job the way you would do it yourself, using your prices, your wording and your rules, so it can draft the notification details, chase the asbestos register before a strip-out starts, or flag that a crew member's licence record needs updating before they are rostered on a job that needs it. AI agents do not remove the duty, that still sits with the PCBU, but they take the non-billable paperwork off the owner's plate so the time goes back into running the site and managing the crew.
This is general information, not legal, tax or employment advice. Check your own situation with the body named here or a qualified adviser.
Where can you check the current rules?
- Demolition work Code of Practice, Safe Work Australia: PCBU, officer and other-person duties under the WHS Act and Regulations.
- Demolition work Code of Practice, SafeWork SA: primary duty of care, demolition licensing and SWMS requirements for powered mobile plant.
- Demolition work duties tool, Safe Work Australia: PCBU duties including SWMS and the asbestos register check.
- Demolition, WorkSafe Queensland: licensing, supervision and the demolition notification form.
- Demolition work Code of Practice, Safe Work Australia (system archive): SWMS requirements and licensed asbestos removalist duties.
- Case study: asbestos removal in domestic demolition, WorkSafe Victoria: employer and PCBU duties under the OHS Act for asbestos in demolition.
- Demolition, Safe Work Australia safety topic: licences for demolition work and notifiable demolition.
- New regulations for demolition licence holders, SafeWork NSW: training requirements for demolition workers and supervisors in New South Wales.
How does Data First Coaching approach this?
Data First Coaching, built by Greg Allan, starts from the demolition contractor's own job and crew data rather than a general checklist. Through the Trade Business Intelligence, it looks at where a WHS or licensing gap actually starts, whether that is at quoting, at crew rostering, or at how asbestos checks and SWMS get recorded on site, because a symptom like a missed notification is usually a sign the paperwork is built too late to catch it. The how, the systems and the builds that fix that are worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member and the Academy is built for owners who are open minded, innovative and willing to share what they learn.

