By Greg Allan, tradesman and creator of Data First Coaching
Why do builders hold up progress payments on waterproofing jobs?
A builder often sits on a waterproofer’s progress claim because their own drawdown from the client or financier is tied to sign-off, and a wet area or balcony job only triggers that sign-off once prep, the membrane application, cure time, a flood test and a certificate all line up. Any gap in that chain, a missed inspection or a defect flagged by the tiler, pushes the claim further back.
Waterproofers are often last in the queue behind the trades that finish more visibly. A bathroom can be fully waterproofed, tiled over and look finished to everyone on site, while the certificate paperwork that actually triggers payment is still sitting on someone’s desk. A builder juggling several jobs and several subbies at once does not always treat that as urgent, even when the terms were agreed upfront.
Why can a waterproofing business still look fine while a progress payment sits unpaid?
Money is still moving through the account, wages go out, GST gets collected on other jobs, so the business can look solvent even when a chunk of earned profit is stuck. Being busy on the next basement or roof deck job is not the same as being paid for the last one.
This is where a waterproofer can quietly lose profit without noticing. The flood test passed, the certificate was issued, the membrane work is done and defect free, but none of that is profit until the invoice clears. A business can carry several of these half-converted jobs at once and still feel fine on the surface, because the owner is reading cash in the account rather than margin actually banked.
What number tells the real story behind the bank balance?
The number that matters is gross profit margin tracked job by job, matched against what has actually been paid rather than what has simply been invoiced. A waterproofer’s own bank balance blends dozens of jobs together and cannot show which specific balcony or wet area job still has its earned margin sitting outside the business.
This is a data first way of looking at the business rather than a feeling. Reading the account tells an owner how much cash moved. Reading margin by job, against what was actually paid, tells an owner which builder, which job type and which certificate stage keeps locking up profit. That is often where the real pattern is, not in one late payment but in a repeated gap between work finished and work paid.
How do you stop a builder dismissing payment terms you both agreed to?
You protect progress payments by treating the agreed terms as non-negotiable and following up in writing the moment a claim is overdue, rather than waiting and hoping the next one arrives on time.
Picture a waterproofer doing wet area and balcony work for a builder who pushed back on a progress invoice even though the payment terms had been agreed before the job started. When it was raised, the builder dismissed it outright. The waterproofer held firm on the terms that had already been agreed, followed up the outstanding invoice until it was paid in full, finished the current job to the standard the warranty required, and then chose not to take further work from that builder. Holding the line on terms that were already agreed is not about being difficult, it is about not letting earned margin sit unconverted on someone else’s schedule.
What can AI agents do to help waterproofers chase progress payments?
An AI agent is software that does a job the way the owner would, using the owner’s own prices, wording and rules, rather than a generic template. For chasing progress payments, an agent can follow up outstanding claims in the waterproofer’s own tone, at the right time against the agreed terms, so the reminder reads as routine rather than a confrontation.
This matters because the awkward phone call is often the thing owners avoid, and every day avoided is another day of margin sitting unconverted. An AI agent can also flag the jobs where the certificate has been issued, the flood test has passed and the work is complete, but payment has not landed, so a waterproofer is never relying on memory to know which builder owes what. Two different agents can work on this at once, one watching for jobs ready to invoice and one watching invoices that have gone quiet.
How does Data First Coaching approach this?
Data First Coaching, built by Greg Allan, starts by reading the waterproofer’s own job and finance data through the Trade Business Intelligence rather than asking the owner to explain the business from memory. On late payments, that means looking at gross profit margin job by job against what has actually been paid, not what simply moved through the account, because that is where the real pattern of lost margin shows up. Greg puts it plainly: “that’s where you lost all of the profit you spent weeks and weeks building”. The how, the agents and the systems that fix it, is worked through inside the Academy, with members, because the Trade Business Intelligence is powered by every member for every member, which is why who joins matters.