By Greg Allan, tradesman and creator of Data First Coaching
Why does pricing a kitchen job by job feel like guesswork?
Most cabinetmakers build a kitchen quote the way they were taught: add up the board, the edging, the hardware, the CNC time and the install hours, then put a markup on top. That shows every input on the page, and a builder or renovator who has had three quotes knows exactly how to read it.
Once the inputs are visible, the conversation stops being about the kitchen and becomes a negotiation over hourly rates and material margin. The builder picks apart the benchtop line against another joiner's benchtop line, the install day against another install day, and the cabinetmaker ends up defending numbers that were never meant to stand alone.
Why can a kitchen that looked fine on the quote leave nothing once it's installed?
Between the first site measure and the final install, costs move. Board, laminate, edging and hardware prices creep, CNC and install time often run longer than the shop drawings suggested, especially once an existing wall or bench turns out to be out of square. If the original price sheet for the kitchen was never reviewed, every one of those increases comes straight off the cabinetmaker's gross profit margin, unnoticed.
This is rarely one bad decision. It is a kitchen priced correctly the week it was quoted and never looked at again while the lead time stretched out and supplier invoices quietly climbed.
What should a kitchen quote actually show the builder or renovator?
A kitchen quote works best when it shows one price per finished item, a cabinet run, a benchtop, a pantry, a wardrobe, a vanity, rather than hours, board cost and markup laid out separately. The client sees what they are getting, not what it took to make it.
This is the same reason a diner orders the dish off the menu and not the ingredients with a price per kilo attached. The cabinetmaker still knows exactly what the board, the edging, the CNC time and the install day cost to produce that cabinet run, but the client is buying the finished piece of joinery, not a breakdown of what went into the workshop to build it.
How does this change the back and forth when a builder wants to tweak the kitchen?
When every item in a kitchen has its own settled price, a builder can add a vanity, drop a wardrobe to simplify the job, or upgrade a benchtop, and the rest of the quote does not need to be reopened. The cabinetmaker edits one line, not the whole document.
This matters because kitchen quotes rarely get accepted as sent. There is almost always a round of changes once the client sees the number, a simplified wardrobe here, a different benchtop there, sometimes two or three versions before anyone signs off and pays a deposit. Pricing by finished item turns that back and forth from a full requote into a short conversation, and it keeps the client focused on their budget rather than on what a cabinet actually costs to build.
What number protects a cabinetmaker's margin across the whole kitchen?
The number that tells the truth on a kitchen job is the gross profit margin across the whole quote, not the margin on any single cabinet or benchtop. A vanity can be priced tight and a wardrobe priced generously and the kitchen can still come out fine overall, or the reverse can be true and nobody notices until the job is finished.
This is a data first way of looking at pricing. It is not a one-off calculation done when the quote goes out, it is a number worth checking across every kitchen, every month, against what board, hardware, CNC time and install actually cost that month, because a price book built on last year's supplier numbers is already working against the cabinetmaker without them knowing it.
How can AI agents help a cabinetmaker keep kitchen pricing accurate?
An AI agent is software that does a piece of the office work the way the cabinetmaker would do it themselves, using their own prices, their own wording and their own rules. For kitchen pricing, that means an agent can watch for supplier price movement on board, laminate, edging and hardware and flag when the price book behind a quote is out of date, before the next kitchen goes out the door at yesterday's numbers.
AI agents can also handle the requoting that eats an evening, rebuilding a kitchen quote after a client drops a wardrobe or upgrades a benchtop, using the cabinetmaker's own priced items rather than starting from a blank page. The cabinetmaker still sets every price and every rule. The agent just makes sure the quote going out the door reflects what things actually cost today, not what they cost when the price sheet was last updated.
How does Data First Coaching approach this?
Data First Coaching starts by looking at the cabinetmaker's own kitchen jobs through the Trade Business Intelligence, not at a generic pricing formula. It looks at where margin is actually sitting across recent kitchens, which items are consistently tight and which carry the job, and where supplier cost rises have gone unnoticed in the price book. As Greg Allan puts it, “your client is paying for the finished product, not the individual components that went into it”, and the coaching works from there to find where a kitchen quote is quietly losing margin before it ever reaches install day. The how, built on the cabinetmaker's own numbers, is worked through inside the Academy, among members who are open minded, innovative and willing to share what they learn, because the Trade Business Intelligence is powered by every member for every member.

